Headland Road

MBA have been appointed by Acorn Properties to carry out structural and drainage design for three developments on Headland Road, Newquay. All have required detailed coordination with both the Architect and the Client to achieve the required quality of accommodation. In addition, all three sites have required careful consideration of the boundary and party wall conditions to ensure that the required temporary works have been put in place whilst accommodating the contractor proposed sequences of working. MBA’s performance and attention to detail on the first of these challenging projects has lead to our appointment on the subsequent developments.

Download datasheet