Pendennis Shipyard

MBA were responsible for the overall Civil and Structural Design of the works which involved the construction of new fabrication facilities over and near an existing wet dock. The works required considerable coordination with the operations of the shipyard and with the many buried services beneath the proposed site.

Download datasheet